Home

Morning Star Church

This Page (Video) 

Upcoming Events
Worship
Missions
Small Groups
Staff
Maps
Stephen Ministry
Expansion Plans
Morning Star Blog

 

 

 

 

  Office

  Pastor

 

 

 

Morning Star United Methodist Church, Las Cruces, NM

"where mercy triumphs over judgment"


WELCOME

Growing Upward with Love 

VIDEO

Note: Video Length 29 minutes

Please wait and video will self start



 

                                                                          Contact Us     Office Hours


Morning Star's 2007 Building Campaign

Expansion Plans Page Contents:

bullet Updates from the Building Committee

bullet Statistics and info. from the Capital Campaign

bullet  Finance Committee 

bullet  Preliminary Building Expansion Plans Education Building floorplans

 

Updates from the Building Committee

Building Committee Update

Your building committee's design team is nearing the completion of the
"architect selection" phase of our process. Once that is completed,
the architect will put together a revised concept drawing based on the
design team's work. That revised concept will be shared with the congregation
in a set of "town hall" meetings, with opportunities to clarify and perfect
the floor plans. We anticipate some adjustments to the preliminary
expansion plans that were published last year, but the stated needs of
increasing worship and classroom space remain at the center of our work.
Once the congregation has been given sufficient opportunities for feedback,
the building team will work with the architect to integrate that input and
move forward with the detail drawings. At that point the finance team will
analyze the costs and the current commitments made to the building fund,
along with possible phasing plans, and we will move forward based on that analysis.

Please keep the building committee in prayer.

We thank you for your generosity and passion to keep "Growing Upward with Love," as we continue
following the call of Christ Jesus. 

~ ~

Building Committee Report

The Building Committee met on February 5, 2008 and elected Mary Anne Schantz as Chair.

The Design Team, led by Homer Brown, expressed concerns of building cost and the fees for only planning, architects, as well as cost of a sprinkler system and an elevator in the education building. After discussion, the Design Team decided to proceed with the sanctuary expansion, to enlarge the existing nursery and add a unisex handicap accessible bathroom compliant with ADA requirements.
Upon completion of that phase, plans will be made to begin construction of the education building based on the financial status of the building campaign funds at that time.
Communications Team Report by Colleen Wismer: the building committee was presented with a copy of the needs analysis to review. This will be the basis of the report to be generated for the proposed facilities and presented to the District Committee.
A short discussion of membership and attendance was held in relation to the possible increase of population due to the proposed increase of White Sands Missile Range.
The communications team will be responsible for getting reports to the congregations as we move forward in this exciting phase of Morning Star’s development. A website soon will be available for your question to be answered about the building and construction at Morning Star.

Statistics and Info. 

Total Amount Pledged:  $425,000

Total Building Gifts Received to Date:  about $80,000

A substantial portion of the gifts received to date did not come from people who pledged... which means we expect to receive more than the amount pledged!  Praise the Lord!  And thanks to all of you!

Pastor's Focus Statement from the Capital Campaign

Download it.

Read it online.

 

Finance Committee

Preliminary Building Expansion Plans

Below are the first of several preliminary plans and elevation drawings.  The first two are floor-plans for the education building.  The first floor, primarily class rooms and meeting spaces, is the goal of the current campaign.  The second floor, primarily offices with some conference/meeting spaces, will be finished at a later date.

Again, these are preliminary plans to get thoughts, hopes, and vision for ministry going, and are not meant to dictate what the final lay-out will be.

Give us feedback by email.

 

Education Building, Floor 1, Classrooms

Preliminary Floorplan #1

 

Education Building, Floor 2, Office

Preliminary Floorplan #1

 

Contact Information

Phone     575-521-3770

Address  2941 Morning Star Dr.  Las Cruces, NM 88011

                 Corner of Roadrunner Pkwy and Morning Star (Map)

Email       office@morningstarumc.org  (Office)

                 pastor@morningstarumc.org  (Pastor)

Office Hours

Office Hours

     Monday-Friday, 9:00 am - 4:00 pm

The Pastor is also available by appointment.

 

webmaster@morningstarumc.org  (Webmaster)

Back to top of page

 

 

      web theme courtesy of
 

Copyright © 2007 Morning Star United Methodist Church. All rights reserved